c. Initial Air Band Setting
i. The nozzle size in GPH INPUT is printed
directly on the air band. Loosen the locking
screw, move the air band until the pointer
on the air shutter and housing lines up with
the appropriate GPH INPUT. Tighten the
locking screws.
ii. The Elite burners use calibrated air bands
marked in nozzle sizes. Models EZ-1HP
and EZ-2HP have air bands calibrated to
deliver the proper amount of air for their
speci c pump pressure. The air bands on
H.P. models are designed to be set by the
rating stamped on the nozzle.
iii. The burner is now set at the approximate
air band setting for the gallonage indicated.
During nal adjustment, using combustion
testing equipment, the air band may need
minor adjustment to achieve the desired
ef ciency.
Water Boilers Only
Select the proper oil nozzle for the installation.
Burners for knockdown V8 water boilers are
shipped with the high (standard) input oil nozzle
installed in the burner.
A second oil nozzle for the lower (minimum)
ring rate is shipped loose for the V83 - V86
models, attached to the burner. Either nozzle
may be used with water boilers. The lower
(minimum) input nozzle will provide greater
boiler ef ciency. However, boiler output will be
reduced. Refer to Table 1B for ring rates. If
the higher rate is desired, inspect the installed
nozzle and assure that the nozzle is the correct
size and type as speci ed in Table 6 of this
manual. The nozzle input is stamped on the hex
at of the nozzle.
If the lower (minimum) input is desired, remove
the nozzle which was factory installed. Locate
the lower (minimum) ring rate nozzle that is
supplied loose. Con rm the nozzle is the proper
size and type for the lower ring rate as speci ed
in Table 6 of this manual. Install the proper
nozzle in the burner nozzle adaptor.
Refer to Step 7a for burner drawer assembly
removal.
M. INSTALL RIELLO OIL BURNER. (See Figure 7).
Follow instructions in Paragraph J, Steps 1 through 6.
7. Install oil nozzle in burner, inspect electrodes and
head setting.
REGNAD
elzzonlionaevahtonseodrenrubehT
deilppus,elzzonlioreporpehT.dellatsni
elzzonehtnidellatsniebtsum,esool
ehttuohtiwrenrubetarepotonoD.rotpada
.renrubehtnidellatsnielzzonlioreporp
NOITUAC
ehttadetarepoebylnotsumsreliobmaetS
etargnirifehtgnisaercnI.tupnirewol
detareleccanitluserlliwtupnisihtevoba
ytnarrawehtdiovlliwdnanoisorrocreliob
.reliobehthtiwdedivorp
Steam Boilers Only
Steam boilers must use the lower input
nozzle. The lower input nozzle will provide
greater boiler ef ciency and for steam
boilers, reduce boiler corrosion. However,
boiler output will be reduced.
Burners for knockdown V83 - V86 steam
boilers are shipped with the lower (standard)
ring rate nozzle installed. Knockdown
V87 - V89 boilers are provided with one
nozzle, installed in the burner, that provides
the same ring rate as the water boiler of the
same size.
a. Installation/Removal of Drawer assembly, refer
to Figure 7B.
Figure 7B: Installation/Removal of Drawer Assembly
i. Removal:
• Disconnect oil delivery tube nut from
pump.
• Loosen SCREW (3), and then unplug
PRIMARY CONTROL (1) by carefully
pulling it back and then up.
Remove the AIR TUBE COVER
PLATE (5) by loosening the retaining
SCREW (4) (Two SCREWS-Model F5).
• Loosen SCREW (2), and then slide the
complete drawer assembly out of the
combustion head as shown.
ii. Installation:
To insert drawer assembly, reverse the
procedure in Step i above.
b. Nozzle Replacement, refer to Figure 7C.
Seitenansicht 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 99 100

Kommentare zu diesen Handbüchern

Keine Kommentare