Figure 2: Minimum Installation Clearances To Combustible Materials (Inches)
A. INSPECT SHIPMENT carefully for any signs of
damage.
1. All equipment is carefully manufactured, inspected
and packed. Our responsibility ceases upon delivery
of crated boiler to the carrier in good condition.
2. Any claims for damage or shortage in shipment
must be led immediately against the carrier by the
consignee. No claims for variances from, or shortage
in orders, will be allowed by the manufacturer
unless presented within sixty (60) days after receipt
of goods.
B. LOCATE BOILER in front of nal position before
removing crate. See Figures 1A thru 1D.
1. LOCATE so that vent pipe connection to chimney
will be short and direct.
2. BOILER IS SUITABLE FOR INSTALLATION
ON COMBUSTIBLE FLOOR. Boiler cannot be
installed on carpeting.
3. FOR BASEMENT INSTALLATION, provide
a solid elevated base, such as concrete, if oor is
not level, or if water may be encountered on oor
around boiler.
4. PROVIDE SERVICE CLEARANCE of at least
24” clearance from front jacket panel for servicing
and removal of front tankless heater (increase to
30" for #A54 heater). If boiler is equipped with
a rear tankless heater, provide at least 24" service
clearance on the right side of the boiler. Boiler
ueways may be cleaned either from the top or from
the right side. Provide at least 24" clearance from
either the right side of the boiler or the top of the
boiler for cleaning ueways.
5. For minimum clearances to combustible materials.
See Figure 2.
ECITON
tnevllawelgnisrofsignitnevotecnaraelC
yamecnaraelc,desusitnevLepyTfI.epip
ehtybderiuqermuminimehtotdecudereb
.rerutcafunamepiptnev
SECTION I: PRE-INSTALLATION
NOTES:
1. Listed clearances comply with American
National Standard ANSI/NFPA 31, Installation of
Oil Burning Equipment.
2. V8 Series boilers can be installed in rooms with
clearances from combustible material as listed
above. Listed clearances cannot be reduced for
alcove or closet installations.
3. For reduced clearances to combustible material,
protection must be provided as described in the
above ANSI/NFPA 31 standard.