Burnham ALP285 Bedienungsanleitung

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Wasserkocher Burnham ALP285 herunter. Burnham ALP285 User Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 3
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
1
A. General Guidelines
1. Read and follow all venting, combustion air,
water piping, gas piping and electrical instructions
contained in the Installation, Operating and Service
Instructions unless otherwise instructed in this
section.
2. Consult Local Building Codes or National Fuel Gas
Code, NFPA 54/ANSI Z222.3 for restrictions and
instructions on modular boiler installations.
B. Venting
1. Each boiler must have an individual vent pipe.
Refer to Venting Section of the Installation,
Operating and Service Instructions for venting
guidelines and options.
WARNING
Do not manifold vent pipes together.
2. The maximum vent length for each boiler is sixty
(60) equivalent feet.
3. The minimum horizontal distance between vent
terminations is one (1) foot. Additional horizontal
distance is desirable to avoid frost damage to the
building. Vent terminations must be at least twelve
(12) inches above the ground plus the expected
snow accumulation.
Modular Installation
CAUTION
Installing multiple vent terminations close
together promotes frost buildup on buildings. To
minimize this possibility, extend the distance from
the building to the end of the vent termination
and increase the horizontal distance between
terminations.
4. Multiple vertical vent pipes may be piped through
a common conduit or chase so that one roof
penetration may be made. Each vent termination
must be one (1) foot from other terminations.
C. Air Intake Piping
1. Each boiler must have an individual air intake
pipe, refer to Venting Section of the Installation,
Operating and Service Instructions for Air Intake
Guidelines and Options.
2. The maximum air intake length for each boiler is
sixty (60) equivalent feet.
3. Locate air intake termination on the same wall as
the vent termination if possible, to prevent nuisance
boiler shutdowns. However, boiler may be installed
with vertical venting and sidewall combustion air
inlet (or visa versa) if installation conditions do not
allow alternate arrangement.
D. Water Piping (See Table S1)
Installing a low water cutoff in the system piping of
modular systems is strongly recommended and may be
required by Local Codes.
Supplemental Instructions
Modular Installation
Alpine™ Series Gas Boiler
These instructions supplement information contained in Installation, Operating and Service Instructions for Alpine™ Gas-Fired
Boiler (IO&S), Part No. 101602-01. Follow Supplemental Instructions and details outlined below until directed otherwise.
WARNING
Prior to attempting any service on this boiler, read, understand and follow all instructions as outlined in
this supplement and also the Installation, Operating and Service Instructions which was provided with the
boiler.
GENERAL INFORMATION
These instructions contain supplemental information related only to Modular Installations on the Alpine™ boiler.
This information is also found in the IO&S manual furnished with the boiler. Refer to IO&S manual for all non-
modular related installation instructions. Where applicable, substitute these instructions, paragraph for paragraph,
for the information outlined in the IO&S manual..
102170-01-6/08
Seitenansicht 0
1 2 3

Inhaltsverzeichnis

Seite 1 - Alpine™ Series Gas Boiler

1A. General Guidelines1. Read and follow all venting, combustion air, water piping, gas piping and electrical instructions contained in the Install

Seite 2

2Figure S1: Modular Boiler Water Piping

Seite 3 - F. Electrical

3TABLE S1: MODULAR BOILER WATER MANIFOLD SIZINGBoiler ModelNumber of Units2 3 4 5 6 7 8Recommended Minimum Common Water Manifold Size (NPT)ALP080 1¼

Verwandte Modelle: ALP210 | ALP399 |

Kommentare zu diesen Handbüchern

Keine Kommentare