Burnham C Series Installationshandbuch

Stöbern Sie online oder laden Sie Installationshandbuch nach Warmwasserbereiter & Kessel Burnham C Series herunter. Burnham C Series Installation Operating Instructions Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 24
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
1
For service and repairs to the heating plant, call your local representatives. When seeking information
on the boiler, provide series and size designation shown on rating plate.
Boiler Number __________________ Type Firing________________ Type System _________
Project______________________________________________________________
Address_________________________________________________ Phone No._____________
INSTALLATION AND OPERATING
INSTRUCTIONS FOR
BURNHAM COMMERCIAL FIRETUBE BOILERS
Commercial Boilers
This manual must only be used by a qualied heating installer/service technician.
BEFORE installing, read all instructions in this manual and all other information
shipped with the boiler. Post all instructions and manuals near the boiler for
reference by service personnel. Perform steps in the order given. Failure to comply
could result in severe personal injury, death or substantial property damage.
Seitenansicht 0
1 2 3 4 5 6 ... 23 24

Inhaltsverzeichnis

Seite 1 - Commercial Boilers

1For service and repairs to the heating plant, call your local representatives. When seeking information on the boiler, provide series and size design

Seite 2 - Hazard denitions

10INSTALLATION INSTRUCTIONSFIGURE 4TS-71-130-DFIGURE 3TS-71-131-D

Seite 3

11INSTALLATION INSTRUCTIONSFIGURE 5TS-71-124-DFIGURE 6TS-71-157-CPREFERREDHARTFORD RETURNCONNECTIONGRAVITY RETURNALTERNATEHARTFORD RETURNCONNECTIONGR

Seite 4

12INSTALLATION INSTRUCTIONSFIGURE 7TS-71-127-B

Seite 5 - TABLE OF CONTENTS

13FIGURE 8INSTALLATION INSTRUCTIONSTS-71-174-D

Seite 6

14D. Turn boiler on and verify that fuel valves are closed during the burner pre-purge cycle. Turn boiler off and disconnect power.E. Adjust burner ac

Seite 7 - 4,000 BTUH/In

156. CLEANING A WATER BOILER The oil and grease which accumulate in a new hot water boiler can be washed out in the following manner. A. Remove safe

Seite 8

168. BOILER WATER TREATMENT Boiler water treatment will help maximize the effectiveness and prolong the life of pressure vessels. The genera

Seite 9

17See item 10 under Operating Instruction if it becomes necessary to add water to the boiler more frequently than once a month. 1. GENERAL Inspecti

Seite 10 - INSTALLATION INSTRUCTIONS

1811. Screw the probe into the boiler tapping.12. Mount the low water cutoff control on the probe.13. Reconnect the control to probe wiring. 14. F

Seite 11

199. ATTENTION TO THE BOILER WHILE NOT IN OPERATION.If a boiler is not used during the winter months, and it is in a place subject to freezing, i

Seite 12

2IMPORTANT INFORMATION - READ AND SAVE THESE INSTRUCTIONS

Seite 13

20 ITEM FREQUENCY ACCOMPLISHED BY REMARKS PERIODIC TESTING RECOMMENDED CHECK LISTGauges, monitors, and Daily Operator Make visual inspection a

Seite 14

21 ITEM FREQUENCY ACCOMPLISHED BY REMARKS Atomizing Air/Steam Annually Service Technician Refer to burner instructionsHigh and Low Gas Monthl

Seite 17

24LIMITED WARRANTYLIMITED WARRANTYSubject to the terms and conditions herein, Seller warrants to the original owner at the original installation site

Seite 18

3This boiler has a limited warranty, a copy of which is printed on the back of this manual.It is the responsibility of the installing contractor to se

Seite 19

4Appliance materials of construction, products of combustion and the fuel contain alumina, silica, heavy metals, carbon monoxide, nitrogen oxides, ald

Seite 20

5TABLE OF CONTENTSSECTION I General informationIntroduction ...

Seite 21 - CHECK LIST

6INTRODUCTION1. Refer to burner manufacturer’s installation manual provided for proper venting of the gas train components that require atmospheric

Seite 22

7FRONT OF BOILERSMOKEPIPE - DO NOT REDUCE BELOW SIZE OF COLLAR ON REAR SMOKEBOXTHIMBLEFIGURE 1TYPICAL ARRANGEMENT FOR STUB

Seite 23

81. BOILER PIPINGAttach supply and return piping lines and insert plugs and bushings in connections as required. Supply and return piping headers are

Seite 24

95. TEMPERING OF HOT WATER Installation of an automatic mixing valve will lengthen the delivery of the available hot water by mixing some cold water w

Kommentare zu diesen Handbüchern

Keine Kommentare