MPC Multiple Pass Commercial Boiler – Suggested Specifications
Heating, Ventilating and Air Conditioning
15500-1
2.1 GENERAL
A. Reference is made to the clause entitled “Buy American Act Balance of Payments Program –
Construction MaterialsFAR 52.225-9. Notwithstanding a bidder’s right to offer identifiable
foreign construction material in its bid pursuant to FAR 52.225-9, the awarding authority does
not anticipate accepting an offer that includes foreign construction material.
B. All manufacturers to be considered shall be required to meet or exceed scheduled I=B=R ca-
pacities and ratings and will be held to strict compliance with these contract specifications. For
factory assembled, packaged and firetested boilers, the complete boiler shall be approved as a
unit by Underwriters Laboratories.
C. Installing contractor shall include, as part of his contract, all charges and costs for boiler and
burner testing, start-up, checkout, adjusting, field and state inspections, including service con-
tracts for systems and equipment as here-in-after specified. Provide signed documentation to
the awarding authority for completion of specified procedures.
D. Contractor shall obtain certificate of boiler inspection after boiler installation has been com-
pleted and pay all fees associated with such inspection. After receipt of certificate of inspec-
tion, installing contractor shall furnish a suitable glass front frame in which to place said cer-
tificate. Frame, with inspection certificate inserted therein, shall then be placed on or posted in
a suitable location within the boiler room in which the new boilers have been installed.
E. Installing contractor shall obtain from the boiler manufacturer pertinent (O&M) operating, test-
ing, and cleaning instructions for the boilers, burners, controls and safety devices furnished
with the Boiler(s).
F. It shall be the responsibility of the installing contractor to deliver O&M manuals, together with
complete wiring and piping diagrams, to the owner/user and to obtain a receipt for the instruc-
tions. The receipt shall be filed with the installation report.
G. Written notification specifying the name, address, telephone number and available service pro-
gram of a third party burner service group as herein specified.
2.2 WARRANTY
A. The manufactured heating units, equipped with cast iron/metal push nipple connectors, the
boiler manufacturer shall warrant that the cast iron sections of each boiler will be free from de-
fects in material and workmanship under normal usage for a period of ten years from the date
of original installation.
1. Burners: The burner manufacturer shall warrant each burner for a period of 15 months
from date of shipment.
Seitenansicht 0
1 2 3 4 5 6 7 8

Inhaltsverzeichnis

Seite 1

BURNHAM COMMERCIAL 27 February 2008 MPC Multiple Pass Commercial Boiler – Suggested Specifications Heating, Ventilating and Air Conditioning 1550

Seite 2

BURNHAM COMMERCIAL 27 February 2008 MPC Multiple Pass Commercial Boiler – Suggested Specifications Heating, Ventilating and Air Conditioning 1550

Seite 3

BURNHAM COMMERCIAL 27 February 2008 MPC Multiple Pass Commercial Boiler – Suggested Specifications Heating, Ventilating and Air Conditioning 1550

Seite 4

BURNHAM COMMERCIAL 27 February 2008 MPC Multiple Pass Commercial Boiler – Suggested Specifications Heating, Ventilating and Air Conditioning 1550

Seite 5

BURNHAM COMMERCIAL 27 February 2008 MPC Multiple Pass Commercial Boiler – Suggested Specifications Heating, Ventilating and Air Conditioning 1550

Seite 6

BURNHAM COMMERCIAL 27 February 2008 MPC Multiple Pass Commercial Boiler – Suggested Specifications Heating, Ventilating and Air Conditioning 1550

Seite 7

BURNHAM COMMERCIAL 27 February 2008 MPC Multiple Pass Commercial Boiler – Suggested Specifications Heating, Ventilating and Air Conditioning 1550

Seite 8

BURNHAM COMMERCIAL 27 February 2008 MPC Multiple Pass Commercial Boiler – Suggested Specifications Heating, Ventilating and Air Conditioning 1550

Kommentare zu diesen Handbüchern

Keine Kommentare